期刊文献+

基于IP-ACO算法的航天器测控资源调度技术 被引量:1

Spacecraft TT&C resource scheduling based on improved Pareto ant colony optimization algorithm
下载PDF
导出
摘要 采用多目标蚁群优化算法对航天器测控资源调度问题进行研究。在分析中低轨道航天器测控特点的基础上,综合考虑包括测控时间窗口约束和设备切换时间约束在内的多类复杂约束条件,建立多目标航天器测控资源调度模型。在Pareto蚁群优化算法的基础上,引入蚁群社会中的分工协作思想并构建测控任务时间约束有向图,设计基于任务选择期望的状态转移规则和基于自适应网格技术的权重更新策略,从而提高算法求解性能。仿真实验结果表明该方法能有效解决多目标航天器测控资源调度问题。 Multiobjective ant colony optimization(ACO) algorithm is used to solve the spacecraft tracking teremetry and command(TTC) resource scheduling problem(STRSP).Based on the analysis of TTC characteristics for low earth orbit and medium earth orbit spacecrafts,a multiobjective mathematical formulation for the STRSP is presented,which takes the time window constraints and setup time constraints into account.Then,an improved Pareto-ACO(P-ACO) algorithm referred to the division of labor and cooperation mechanism is put forward to solve the problem.The problem is formulated as path search of task temporal constraint directed graph and the P-ACO algorithm is improved by designing the state transition rules based on the expectation of task choice and the strategy for weights update based on adaptive grid technique.The experimental results demonstrate the proposed algotithm is effective in solving the multiobjective STRSP.
出处 《系统工程与电子技术》 EI CSCD 北大核心 2012年第4期719-725,共7页 Systems Engineering and Electronics
基金 国家自然科学基金(60803051) 国家高技术研究发展计划(863计划)(2005AA735080)资助课题
关键词 多目标蚁群优化算法 任务调度 时间约束有向图 自适应网格 multiobjective ant colony optimization(ACO) algorithm task scheduling temporal constraint directed graph adaptive grid
  • 相关文献

参考文献20

  • 1Cooley T D. Automating the satellite range scheduling process[D].Ohio:Air Force Institute of Technology,1993. 被引量:1
  • 2Schalck S M. Automating satellite range scheduling[D].Ohio:Air Force Institute of Technology,1993. 被引量:1
  • 3Zufferey N,Amstutz P,Giaccari P. Graph colouring approaches for a satellite range scheduling problem[J].Journal of Scheduling,2008,(04):263-277. 被引量:1
  • 4金光,武小悦,高卫斌.卫星地面站资源配置仿真研究[J].系统仿真学报,2004,16(11):2401-2403. 被引量:32
  • 5陈峰,武小悦.天地测控资源一体化调度模型[J].宇航学报,2010,31(5):1405-1412. 被引量:13
  • 6翟政安,唐朝京.航天测控网资源均衡分配的调度方法[J].中国空间科学技术,2006,26(4):55-60. 被引量:5
  • 7Barbulescu L,Howe A,Watson J P. Satellite range scheduling:a comparison of genetic,heuristic and local search[A].2002.611-620. 被引量:1
  • 8Barbulescu L,Watson J P,Whitley D. Scheduling spaceground communications for the air force satellite control network[J].Journal of Scheduling,2004,(01):7-34. 被引量:1
  • 9Marinelli F,Nocella S,Rossi F. A lagrangian heuristic for satdlite range scheduling with resource constraints[J].Computers and Operations Research,2011,(11):1572-1583. 被引量:1
  • 10Preindl B,Seidl M,Mehnen L. A performance comparison of different satellite range scheduling algorithms for global ground station networks[A].2010. 被引量:1

二级参考文献60

共引文献150

同被引文献12

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部