期刊文献+

改良型装配式人工湿地处理北京市城乡结合部污水的研究 被引量:1

Research on Sewage Treatment by Fabricated Constructed Wetland in Urban-rural Conjunction Areas of Beijing
下载PDF
导出
摘要 适当的水力条件是实现人工湿地处理目标和正常运行的基本保证。人工湿地水力停留时间较长是最为突出的一个问题,它直接导致了系统处理能力偏小。针对这个问题,本文采用改良型装配式人工湿地,进行了停留时间的试验研究。结果表明,在停留时间为4 d的条件下,COD的平均去除率为87.54%,NH4+-N的平均去除率为37.08%,TN的平均去除率为31.9%。 The appropriate hydraulic condition is the basic guarantee of achieving treatment goals and normal operation of constructed wetland.The long hydraulic retention time is the most outstanding problem which directly leads to small processing capacity of the system.To solve this problem,this paper adopts the modified type of fabricated constructed wetland and studies the retention time.The results showed that the average removal rate for COD is 87.54%,for NH+4-N 37.08%,and TN 31.9% in the condition of residence time of 4 days.
出处 《环境科学与管理》 CAS 2012年第4期58-60,共3页 Environmental Science and Management
基金 北京市科技计划课题(D101109046810002)
关键词 装配式人工湿地 水力停留时间 去除率 fabricated constructed wetland hydraulic retention time removal rate
  • 相关文献

参考文献7

二级参考文献49

共引文献47

同被引文献37

引证文献1

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部