摘要
注浆技术是通过隧道不良地质的常用方法之一。齐岳山隧道穿越多个断层地段,通过长、中、短超前地质预测预报技术,准确判定隧道围岩地质,施工中采用注浆回固技术通过断层。
Grouting reinforcement technique is one of usual methods adopted in fractured rocks.By long and medium term forecasting of geological conditions ahead of tunnel face,an accurate fault position can be determined.By means of grouting enforcement technique,tunnel excavation was carried out through several faults smoothly.
出处
《铁道建筑技术》
2012年第3期40-42,共3页
Railway Construction Technology
关键词
隧道工程
注浆加固
超前地质预报
tunnel engineering
grouting enforcement
forecasting of geological conditions