摘要
介绍了朝阳珠江斜拉桥主塔承台施工采用钢板桩的原因、施工方法及取得的良好效果。
The reason of adopting steel sheet pile in construction of king-tower bearing platform of Pearl River cable-stayed bridge of Chaoyang,construction method and good effect obtained are introduced.
出处
《北方交通》
2012年第3期81-84,共4页
Northern Communications
关键词
钢板桩
围堰设计
斜拉桥
承台施工
Steel sheet pile
Cofferdam design
Cable-stayed bridge
Construction of bearing platform