摘要
介绍了西安地铁2号线潏河停车场间跟随所的工程概况,依据该施工现场实际情况进行施工方案设计,同时阐述了施工技术要点,并给出质量安全保证措施,以保证其施工质量。
This paper introduces the engineering condition of Xi'an subway line No.2 Yuhe parking internal following station,carries on construction design according to actual construction site condition,indicates points of the construction technique and provides measures to ensure the quality and safety,with a view to guarantee the construction quality.
出处
《山西建筑》
2012年第12期113-114,共2页
Shanxi Architecture
关键词
接地线
引下线
均压环
earthing conductor
down-conductor
grading ring