摘要
在某热电联产机组的调试过程中,发现扩容器的疏水管道异常向外疏水,且存在EH油系统高压油的油压偏低等问题。针对这些问题进行了分析和相关的处理,解决了系统运行中存在的问题,可为以后的调试工作提供借鉴。
Abnormal draining was found in the drain pipe of the flash tank and some problems were also found in EH oil system such as low oil pressure during the commissioning of a combined heat and power generation. Analysis and handling have been carried out in light of all those problems. Problems in the operation have been solved from which the lessons can also been drawn in future commissioning work.
出处
《电站辅机》
2012年第1期39-41,共3页
Power Station Auxiliary Equipment
关键词
热电厂
机组
调试
控制
分析
水泵
问题
处理
thermal power plant
power unit
commissioning
control
analysis
water pump
problem
handling