摘要
结合兰新铁路西河镇湟水河特大桥跨湟水河连续梁边跨直线段施工,探讨高速铁路高墩连续梁边跨直线段采用膺架挂篮法施工技术。
Combined with Lanzhou-Xinjiang Railway Huangshuihe bridge in Xihezheng continuous beam side span straight section construction, the article introduces the construction of the continuous beam side span straight section with scaffolding hanging basket construction technology.
出处
《铁道建筑技术》
2012年第2期82-85,共4页
Railway Construction Technology
关键词
高墩
边跨直线段
挂篮法
high pier
side span straight section
hanging basket