5Johnson. Optimal tow-and-three-stage production schedules with setup times included[ J] , Naval Res Logist Quart, 1954 (1) :61-68. 被引量:1
6Gupta J N D. Two-stage Hybrid Flow shop scheduling prob- lem[J]. Journal of Operational Research Society, 1988,39 (4) :359-364. 被引量:1
7Sriskandarajah C, Sethi S P, Scheduling algorithm for flexible flow shops:Worst and average case performance [ J ]. Euro- pean Journal of Operational Research, 1989,43 : 143-160. 被引量:1
8Lee C Y,Vairaktarakis G L,Minimizing makespan in hybrid flow shops[ J]. Operations Research Letters, 1994,16 : 149-158. 被引量:1
9Osman I H, Potts C N. Simulated Annealing for Permutation Flow-Shop Scheduling[ J ]. Omega ( Oxford ), 1989,17 ( 6 ) : 551-557. 被引量:1
10Moccellin J V. A new heuristic method for the permutation flow shop scheduling problem [ J ]. The Journal of the Opera- tional Research Society,1995,46(7) :883-886. 被引量:1