期刊文献+

荧光灯用交流电子镇流器容性泄漏电流测试解析 被引量:1

Research on the Test of Capacitive Leakage Current of A.C. Supplied Electronic Ballasts for Fluorescent Lamps
原文传递
导出
摘要 主要对GB 19510.4-2009标准规定的容性泄漏电流的测试方法及要求进行了分析,明确了试验条件、仪器设备、操作方法及标准中未作规定的频率的限值选取方法等,并通过实例说明如何判定所测容性泄漏电流是否符合标准要求,可以为采用标准的相关厂家提供指导和参考。 This paper mainly analyzes the testing method and requirement of leakage current according to the standard GB 19510.4 -2009, and defines the testing condition, requirement of equipment, operating method and the selection of the limits for the frequency not defined. Also, the judgment, whether the measured results of capacitive leakage current comply with the requirement of the standard or not, is clarified by examples, which can give instructions and references for the manufacturers using the standard.
作者 李栋 刘跃占
出处 《中国照明电器》 2012年第1期30-34,共5页 China Light & Lighting
关键词 电子镇流器 容性泄漏电流 启动时间 限值 electronic ballasts capacitive leakage current starting time limits
  • 相关文献

参考文献4

  • 1GB19510.4-2009灯的控制装置第4部分:荧光灯用交流电子镇流器的特殊要求[S]. 被引量:1
  • 2GB/T15144-2009管形荧光灯用交流电子镇流器性能要求[S]. 被引量:2
  • 3IEC 61347-2-3:2000+A1:2004+A2:2006 Lamp controlgear-Part 2-3:Particular requirements for a.c.supplied electronicballasts for fluorescent lamps[S]. 被引量:1
  • 4IEC 60929:2006 AC-supplied electronic ballasts for tubularfluorescent lamps-performance requirements[S]. 被引量:1

共引文献1

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部