摘要
由于原水水质不稳定,松江自来水公司二水厂亟需实施深度处理改造以保证出厂水水质达标。该厂创造性地将原有平流式沉淀池进行改造,克服了厂区用地紧张、电力容量不足等诸多难题,在常规处理工艺基础上新增O3—BAC深度处理工艺,最终使出厂水水质达到了《生活饮用水卫生标准》(GB 5749—2006)。
Songjiang Second Waterworks urgently needed advanced treatment reconstruction to meet the standard for treated water due to unstable raw water quality. The original horizontal-flow sedi- mentation tank was reconstructed. Many difficulties of land shortage, insufficient power capacity and so on were overcome. O3/BAC advanced treatment process was added on the basis of conventional process. The finished water quality meets the requirement of the Standards for Drinking Water Quality ( GB 5749 - 2006).
出处
《中国给水排水》
CAS
CSCD
北大核心
2012年第6期73-77,81,共6页
China Water & Wastewater
关键词
自来水厂
常规处理
深度处理
平流沉淀池
臭氧活性炭
waterworks
conventional treatment
advanced treatment
horizontal-flow sedimentation tank
ozone/activated carbon