摘要
介绍某高桩码头靠岸侧斜桩在桩帽处断桩现象,分析认为在斜桩轴向力的水平分力作用下,斜桩与桩帽的连接强度不足是断桩主要原因,软土地基、施工质量和堆场超载也是断桩原因,建议桩的结构计算时要进行斜桩与桩帽或横梁连接计算。
The oblique bearing pile nearby shore in a wharf was damaged at the joint of the obhque bearing pile and the pile cap. It is thought that under the horizontal component of the axial compressive force of the oblique bearing pile, the lack of jointing strength of the oblique bearing pile and the pile cap is the major reason for the damage. Besides, the soft ground, construction quality of the joint and overload of storage yard may also cause the damage. It is suggested to carry out the calculation for the connection of the oblique bearing pile and the pile cap or the transverse beam.
出处
《水运工程》
北大核心
2012年第2期74-77,共4页
Port & Waterway Engineering
关键词
斜桩轴向力的水平分力
斜桩与桩帽连接强度
软土地基
施工质量
堆场超载
horizontal component of axial compressive force of oblique bearing pile
connection strength ofoblique bearing pile and pile cap
soft ground
construction quality of joint
overload of storage yard