摘要
介绍胜利油田应用IKP(综合资源规划〕方法和DSM(需求方管理)技术的情况,通过对应用前及应用过程中电力负荷预测值的对比,分析了其应用效果对电力负荷的影响,同时根据应用情况提出下一步的应用设想。
The situation applying Integrated Resoare Pacing (IRP) and Demand Side Management (DSM) in Shengli Oilfield is introduced. The influence of aPPlying result to power load is analyzed through contrasting the power load forecast Values before and during applying Process. MeanWhile, the idea in future is put forward in ccordance with the applying situation.
出处
《石油规划设计》
2000年第1期13-15,共3页
Petroleum Planning & Engineering