针对龙滩水电站主变冷却器控制系统存在的问题和实际运行情况,通过查找和分析主变油温、冷却器运行台数和负荷之间的平衡点关系,提出相应的优化方法,总结了优化主变冷却器运行的实际经验。
Based on existing problems and actual operation situations of main transformer cooling control system at Longtan hydropower plant,the paper puts forward the corresponding optimization method through seeking and analyzing balanced point between running numbers and loads of main transformer oil temperature cooler,and summarizes the experiences on optimization of main transformer cooler.
出处
《红水河》
2012年第1期51-53,57,共4页
Hongshui River
关键词
主变
冷却器
运行
优化
龙滩水电站
main transformer
cooler
operation
optimization
Longtan hydropower plant