摘要
小型引水式水电站首部枢纽设计方案的优劣直接决定着引用流量的质量和大小,在整个工程建设中具有重要地位。文章通过对一典型工程首部枢纽设计方案优化调整成功案例的简要介绍,旨在为在建、待建类似工程提供一些有益的启示和探索。
Whether the design scheme for the head works of a small-sized diversion-type hydropower station is optimum directly controls quality and quantity of available discharge.This plays an important role in the whole engineering construction.This paper is to provide similar projects under construction and to be constructed with some beneficial revelation and exploration through a brief introduction to one successful example of optimization and adjustment of the design scheme for head works of a typical project.
出处
《西北水电》
2012年第1期22-25,共4页
Northwest Hydropower
关键词
小水电
首部枢纽
优化设计
调整
Small-sized hydropower station
head works
optimized design
adjustment