期刊文献+

知木林水电站首部枢纽设计方案优化探讨 被引量:3

Study on Optimization of Design Scheme for Head Works,Zhimulin Hydropower Station
下载PDF
导出
摘要 小型引水式水电站首部枢纽设计方案的优劣直接决定着引用流量的质量和大小,在整个工程建设中具有重要地位。文章通过对一典型工程首部枢纽设计方案优化调整成功案例的简要介绍,旨在为在建、待建类似工程提供一些有益的启示和探索。 Whether the design scheme for the head works of a small-sized diversion-type hydropower station is optimum directly controls quality and quantity of available discharge.This plays an important role in the whole engineering construction.This paper is to provide similar projects under construction and to be constructed with some beneficial revelation and exploration through a brief introduction to one successful example of optimization and adjustment of the design scheme for head works of a typical project.
出处 《西北水电》 2012年第1期22-25,共4页 Northwest Hydropower
关键词 小水电 首部枢纽 优化设计 调整 Small-sized hydropower station head works optimized design adjustment
  • 相关文献

参考文献2

  • 1GB50071-2002.小型水力发电站设计规范[S].[S].,.. 被引量:16
  • 2周素珍.取水枢纽工程[M].武汉:武汉水利电力出版社2000. 被引量:1

共引文献15

同被引文献9

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部