关键链项目管理在船舶预舾装中的应用研究 被引量:7

Critical Chain Project Management in the Ship Pre-outfitting Application
下载PDF
导出
摘要 针对船舶预舾装工程资源受限项目调度问题,结合关键链法和遗传算法,提出了一种基于资源转移的资源优化配置办法。首先根据项目优先权对项目逐个进行资源的初始分配,进而识别关键链,最后确定资源分配计划。通过算例将资源配置方法应用于预舾装工程的项目管理中,提高了多项目管理中的资源利用率,缩短了项目工期,并为在多项目并行条件下进行关键链多项目管理提供了理论参考。 In order to solve the problem of resource - constrained project scheduling in ship pre - outfitting project, this paper, combined with genetic algorithm and critical chain theory, proposed an optimal means of resources allocation based on the transfer of resources. This research improved resource utilization in multi - project management and shortened the project duration. According to project priority, it initially allocated resources to projects one by one, then identified critical chain, and finally confirmed resource allocation plan. Through an example, .resources allocation method was applied to pre - outfitting engineering project management, which provided a theoretical reference for managers in multi - project critical chain under the conditions of parallel multi - project management.
作者 任南 梁冰
出处 《科技管理研究》 CSSCI 北大核心 2012年第4期185-189,197,共6页 Science and Technology Management Research
基金 国家自然科学基金项目"复杂产品项目集成工作分解结构(IWBS)方法研究"(71171101) 教育部人文社科青年规划基金项目"复杂产品制造中工作分解结构的集成优化及其实证研究"(10YJC630199)
关键词 关键链项目管理 资源受限 资源优化配置 船舶预舾装 CCPM resource - constrained optimal allocation of resources ship pre - outfitting
  • 相关文献

参考文献10

二级参考文献45

共引文献181

同被引文献65

引证文献7

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部