本文通过前洪水库坝身、坝基工程地质条件的分析,并结合工程实际运行情况,对前洪水库除险加固工程中应注意的问题进行综合地质评价。
An overall evaluation was made of the problems which should be paid more attention to in the risk - elimination and enforcement project of Fengyang Qianhong Resevoir by analyzing geological conditions of the dam body and base construction, combining with the actual operation of the project.
出处
《安徽科技学院学报》
2011年第6期66-69,共4页
Journal of Anhui Science and Technology University
关键词
前洪水库
大坝地质条件
除险加固
综合地质评价
防渗
承载力
Qianhong Resevior
Geological conditions of the dam
Risk - elimination and enforcement
Compre-hensive geological evaluation
Seepage control
Bearing capacity