期刊文献+

采煤机牵引部电动机筒返修的措施

Shearer's Haulage Unit Electric Motor Cylinder Repair Scheme
下载PDF
导出
摘要 简要介绍了某滚筒采煤机牵引部壳体铸造后电动机筒部位因筒体偏置及筒体直径过大导致机加工后仍有大面积黑皮,影响电动机在矿井下安装和使用的问题。提出了沿筒体圆周方向均布焊接板条、筒体圆周面整体堆焊焊材、筒体镗孔后镶套三种返修方案。根据焊接工艺控制及筒体结构等的可行性分析,最终确定了筒体镗孔后镶套的返修方案,顺利地解决了铸造后电动机筒的缺陷,并节约了返修成本。 Briefly introduces a large volume black skin that is led by biasing of cylinder and too large diameter after shear' s haulage unit casting, which affect the electric motor installing and use at underground coal mine. Three repair schemes are proposed including welding batten plates along the circumference of electric motor cylinder, overlaying batten plates along the circumference and bush fitting at the back of cylinder' s internal boring. According the feasibility analysis of welding technique control and cylinder structure, the third repair scheme that bush fitting at the back of cylinder' s internal boring is settled down, which successfully solves the deficiency of cast electric motor cylinder and saves repair cost.
出处 《煤矿机电》 2012年第1期99-101,共3页 Colliery Mechanical & Electrical Technology
关键词 牵引部 电机筒 返修方案 haulage unit electric motor cylinder repair scheme
  • 相关文献

参考文献3

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部