期刊文献+

长江口岸直水道鳗鱼沙心滩头部守护工程局部冲刷系列水槽试验研究 被引量:3

Local scour series of flume experiment of Manyusha shoal head protection engineering in Kou'an straight reach of the Yangtze River
下载PDF
导出
摘要 为维持长江口岸直水道下段目前较为有利的滩槽格局,将在鳗鱼沙心滩头部建造护滩守护工程,需要研究守护工程周边的最大冲刷深度,以确定边缘压石宽度与重点防护部位。采用1∶100与1∶200的系列水槽试验研究护滩工程周围的局部冲刷深度,试验结果表明:局部可能最大冲深6.0 m左右,结果可应用于工程设计。 In order to maintain a more favorable pattern of beach slot at present in Kou'an straight reach of the Yangtze River,Manyusha shoal head protection engineering will be implemented,thus the maximum scour depth surrounding the project need to be studied to determine the width of pressure stone in edge and the key protection parts.The flume series experiments with the scale of 1∶100 and 1∶200 are used to study the local scour depth around beach protection project.The result shows that the depth of maximum local scour will be 6.0 m,which can be applied to the engineering design.
出处 《水运工程》 北大核心 2012年第1期105-110,共6页 Port & Waterway Engineering
关键词 长江口岸直水道 鳗鱼沙心滩 护滩工程 系列水槽 Kou'an straight reach of Yangtze River Manyusha shoal beach protection engineering series of flume
  • 相关文献

参考文献13

二级参考文献38

共引文献39

同被引文献14

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部