新运营环境下三峡梯级联合调度系统方案设计 被引量:1

Scheme System Design for the Joint Operation of Three Gorges Cascade Hydropower Plants under New Operation Environment
下载PDF
导出
摘要 针对新的运行环境下三峡-葛洲坝梯级联合优化运行对调度系统的要求,指出了系统设计面临的主要问题,设计了联合优化系统的功能结构,通过合理设置信息管理、预报预测和联合优化调度等主要系统模块的功能,提出基于面向对象的程序实现方法和数据库结构,较好地解决了程序设计中的主要问题,提供了三峡梯级联合优化调度系统的集成方案。 Under new operation environment, the joint operation of three gorges cascade hydropower plants need new scheme system. The main problems in scheme system design are analyzed and the functional structure is designed. The main modules of system such as information management, forecasting and joint operation scheduling are properly set up, and at the same time, the programming method and the database structure are also put forward based on object-oriented concept for solving the problems. The integration scheme of the system is proposed.
出处 《水力发电》 北大核心 2012年第2期61-64,共4页 Water Power
基金 科技部项目(KJB0909/ZY02) 长江科学院基本科研业务费项目(CKSF2010001) 国家重点基础研究发展计划(973计划)项目(2007CB714106)
关键词 三峡-葛洲坝梯级 联合优化调度 功能结构 面向对象 集成方案 Three Gorges-Gezhouha cascade hydropower plant joint optimal operation functional structure objectoriented integration scheme
  • 相关文献

参考文献9

二级参考文献85

共引文献175

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部