摘要 从日本石川岛播磨重工("IHI",Ishikawa jima-Heavy Industries)引进的Φ6520 mm双圆盾构机,经上海轨道交通4号、6号线部分区段隧道施工后,因地表沉降较大,在群楼密集与地下管线较多的地区不适合使用。为使该机复活继续使用,在采取多项技术措施后,将双圆盾构改成两台单圆盾构机是可行的。改成后的Φ6340 mm单圆盾构机在浙江省杭州市轨道交通2号线施工应用,情况良好。 Ф6520 mm double-circular shield was introduced from Japanese Ishikawajima-Harima Heavy Industries Co, Ltd("IHI"). It has been used in partial sector tunnel construction, the ground subsidence was great, so it's not suitable for use in Shanghai areas where have intensive buildings and pipelines. In order to cause the machine reactivating to continue to use, it is feasible to alter in to two single-circular shield by taking several technical measures, Ф6340 mm single-circular shield which was reconstructed from the doub- le-circular shield has been used in Hangzhou Metro line 2, Zhejiang Province, and obtained a good effect.
作者 陈佳璋
出处 《传动技术》 2011年第4期15-17,43,共4页 Drive System Technique
关键词 双圆盾构 单圆盾构 主要技术措施 应用 double-circular shield single-circular shield major technical measures application
  • 相关文献

参考文献2

  • 1汽车工程设计手册[M].设计篇.北京:人民交通出版社,2001. 被引量:1
  • 2肖超胜等编..丰田汽车维修手册 底盘新技术新结构[M].长春:吉林科学技术出版社,1996:670.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部