摘要
某300MW火电厂对烟气脱硫系统实施了"2炉3塔"改造,以期充分利用闲置的脱硫系统,提高在运行机组的脱硫效率,效果良好。文章简要介绍了该改造项目涉及的仪表与控制方案。
A 300MW thermal power plant upgrades the flue gas desulfurization system by "Two Boilers with Three Absorption Towers", so as to make full use of idle desulfurization system and improve the desulfuration efficiency of running unit. The innovation project obtains a good result. This paper makes an introduction to the instrument and control program involved in the innovation project
出处
《红水河》
2011年第6期130-133,共4页
Hongshui River
关键词
脱硫
仪表
控制
大型火电厂
desulfurization
instrument
control
large thermal power plant