采用横穿集水管法整治石太客运专线路基表层冻害

Renovation of Frozen Harzard of Subgrade Surface by Cross Water-collecting Pipe for Shijiazhuang-Taiyuan Passenger Dedicated Railway
下载PDF
导出
摘要 石太客运专线路基大多数位于黄土地段,开通运营后2009年首个冬季发生大量冻害,其中以路基冻害居多。采用横穿集水管工程措施对路基冻害进行了整治,取得了较好的整治效果,提供了可借鉴经验。 Most of the subgrade of Shijiazhuang-Taiyuan passenger dedicated railway is located in loes section. This raiway was put into operation in 2009, but a large amount of frozen harzard occurred in the first winter and most was in subgrade. The renovation was made by engineering measure of cross water-collecting pipe with good effect.
出处 《探矿工程(岩土钻掘工程)》 2012年第1期65-67,共3页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 黄土路基 路基上浮冻害 横穿集水管 石太客运专线 loess subgrade subgrade uplift frozen harzard cross water-collecting pipe Shijiazhuang- Taiyuan passenger dedicated railway