摘要 研究了工期可指派且机器具有学习效应的单机成组排序问题.机器具有与位置和工件都有关学习效应.同一个组的所有工件在机器上连续加工且每个组在加工之前都有一个组安装时间.工件有两种工期指派规则分别是FML-CON和FML-SLK.目标是确定所有组的加工顺序以及每个组内工件的加工顺序,再对每个工件指派最优工期使所有工件的工期指派费用,提前、延误费用以及总流程时间之和达到最小.本文分别对两种工期指派下的问题做了详细的分析,并给出多项式时间最优算法.另外,对一种具有特殊的学习效应模型的问题,给出O(nlog n)时间最优算法. In this paper, we consider a single-machine scheduling problem involving learning effects, due date assignment and job scheduling under a group technology environment. The learning effect is job-dependent and po- sition-dependent. To achieve production efficiency and save time/money resource, all jobs of the same group are required to be processed contiguously on the machine. A sequence-independent setup time precedes the processing of each group. The due dates are assignable according to one of the following two due date assignment methods: FML-CON and FML-SLK. The goal is to determine an optimal combination of the due date assignment strategy and job schedule so as to minimize objective function that includes earliness, tardiness, due date assignment and flow time costs. A unified optimization algorithm is provided for all of the above two due date assignment methods. For a special case, we show that they can be solved optimally in O(nlogn) time.
作者 任慧敏
出处 《曲阜师范大学学报(自然科学版)》 CAS 2012年第1期5-12,共8页 Journal of Qufu Normal University(Natural Science)
基金 国家自然科学基金项目(11071142) 山东省自然科学基金项目(ZR2010AM034)
关键词 学习效应 工期指派 成组技术 单机排序 learning effect group technology due date assignment single-machine scheduling.
  • 相关文献

参考文献10

  • 1Wright T P. Factors affecting the cost of airplanes [ J ]. Journal of Aeronautical Sciences, 1936,3 : 122-128. 被引量:1
  • 2Biskup D. Single-machine scheduling with learning considerations [ J ]. European Journal of Operational Research, 1999,115 : 173-178. 被引量:1
  • 3Panwalkar S S, Smith M L, Seidmann A. Common due date assignment to minimize total penalty for the one machine scheduling problem [ J ]. Operations Research, 1982,30 : 391-399. 被引量:1
  • 4Seidmann A, Panwalkar S S, Smith M L. Optimal assignment of due dates for a single processor scheduling problem [ J ]. Interna- tional Journal of Production Research, 1981,19:393-399. 被引量:1
  • 5Gordon V S, Proth J M, Chu C B. A survey of the state-of-the-art of common due date assignment and scheduling research [ J 1- Eu- ropean Journal of Operational Research, 2002a, 139 : 1-25. 被引量:1
  • 6Shabtay D, Steiner G. Two due date assignment problems in scheduling a single machine [ J ]. Operations Research Letters, 2005, 34(6) :683-691. 被引量:1
  • 7Shabtay D, Steiner G. Optimal due date assignment in multi-machine scheduling environments [ J ]. Journal of Scheduling, 2008, 11:217-228. 被引量:1
  • 8Adamopoulos G I, Pappis C P. Single machine scheduling with flow allowances [ J ]. Journal of the Operational Research Society, 1996,47 : 1280-1285. 被引量:1
  • 9Li S S, Ng C T, Yuan J J. Group scheduling and due date assignment on a single machine [ J ]. Int J Production Economics,2011, 130:230-235. 被引量:1
  • 10Hardy G H, Littlewood J E, Polya G. Inequalities [ M ] London : Cambridge University Press, 1967. 被引量:1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部