拱桥加固新方法在头屯河水库除险加固工程中的应用

Application of arch bridge reinforcement new method in rehabilitation of risky Toutunhe reservoir
下载PDF
导出
摘要 采用从拱背上变截面加固改造双曲拱桥的综合治理新方法,对新疆头屯河水库溢洪道交通桥进行了加固。该法在分析拱桥受力特性的基础上提出了分段加固的思路,重点加固拱顶、拱脚,充分利用主拱圈富裕截面,避免了盲目拆除重建造成浪费资金与时间的缺点,对其他拱桥改造具有一定的指导意义。 The access bridge across the Toutunhe reservoir spillway was reinforced by use of the new method of rehabilitating the double- curvature arch bridge from the variable cross-sections on extrados. Based on analysis of the bearing characteristics of arch bridge, a concept of reinforcing the arch bridge by sections is proposed, with focus on reinforcing the arch crown and springing, so as to make full use of the affluent cross sections of the main arch ring, which avoids the waste of money and time in blind removal and rebuilding, providing references for other arch bridge rehabilitation.
出处 《西北水电》 2011年第6期20-22,共3页 Northwest Hydropower
关键词 拱桥 拱背 变截面 加固 arch bridge extrados variable cross-section reinforcement
  • 相关文献

参考文献6

二级参考文献6

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部