深覆盖层河流土石过水围堰体型研究 被引量:7

Study on the Shapes of the Earth-Rock Overtopped Cofferdam on Overburden Layer River
下载PDF
导出
摘要 在深覆盖层河流上采用土石过水围堰度汛方案存在一定风险,但采用合理围堰体型和过流保护措施,能够实现围堰安全度汛。以猴子岩电站土石过水围堰体型为研究对象,通过模型试验,分别对单梯型围堰和面流消能型围堰进行了研究。试验结果表明,对于深覆盖层河流,围堰堰脚的防护尤为重要,采用面流消能型围堰过流效果优于单梯型围堰。 Practice indicates that using the way of diversion through earth-rock overtopped cofferdams on overburden layer river is of certain risk. But with appropriate body shape and some protection measures, the cofferdams will be safe during the flood season. Based on the overtopped cofferdam of Houziyan Hydropower Station, the simple cofferdam and the surface energy dissipation cofferdam were studied through the hydraulic model test. The test results indicate that the hydraulic condition in the shape of the surface energy dissipation cofferdam is better than that of simple cofferdam, and the protection of bottom of the overtopped cofferdam on the overburden layer is very important.
出处 《人民黄河》 CAS 北大核心 2011年第12期115-117,共3页 Yellow River
关键词 土石过水围堰 深覆盖层河流 水工模型试验 围堰体型 面流消能 earth-rock overtopped cofferdam overburden layer river hydraulic model test shape of the cofferdam surface energy dissipation
  • 相关文献

参考文献8

二级参考文献12

共引文献106

同被引文献28

引证文献7

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部