摘要 针对机器故障扰动,研究了炼钢连铸重调度问题及其求解算法。通过将机器故障映射为资源约束,建立了基于动态约束满足的炼钢连铸重调度模型,模型以最大化连浇量与调度方案相似度为目标。针对问题的模型及其特点,采用约束满足和邻域搜索相结合的混合算法对其进行了求解。仿真实验表明本文提出的模型和算法是有效的。 In the steelmaking and continuous casting processes, machine failures occur from time to time. Thus, reseheduling is necessary. In this paper, the rescheduling problem for such processes is addressed. By mapping machine failures to resource constraints, a dynamic constraint satisfaction model is developed for this problem to maximize the quantity of continuous casting and the similarity between the initial sched- ule and the adjust one. Based on this model and by analyzing the characteristics of the problem, a mixed algorithm that combines constraint satisfaction technology with neighborhood search is proposed. Simulation experiments show that the model and algorithm are effective.
出处 《工业工程》 北大核心 2011年第6期84-89,共6页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(70771008) 中央高校基本科研业务费专项资金资助项目(FRF-AS-09-007B) 宁夏医科大学特殊人才科研启动资助项目
关键词 炼钢连铸 重调度 动态约束满足 邻域搜索 steelmaking-continuous casting rescheduling dynamic constraint satisfaction neighborhood search
  • 相关文献

参考文献12

  • 1李铁克,肖拥军,王柏琳.基于局部性修复的HFS机器故障重调度[J].管理工程学报,2010,24(3):45-49. 被引量:20
  • 2庞新富,俞胜平,张志宇,郑秉霖,柴天佑.炼钢-连铸生产优化重调度方法[J].系统工程学报,2010,25(1):98-103. 被引量:26
  • 3Guo Dongfen, Li Tieke. Rescheduling algorithm for steelmaking-continuous casting[ C ]//IEEE Conference Industrial Electronics and Applications (2nd), China: IEEE, 2007: 1421-1425. 被引量:1
  • 4Pang Xinfu, Yu Shengping, Zheng Binglin, et al. Complete modification rescheduling method and its application for steelmaking and continuous casting [ C ]//17th International Federation of Automatic Control. Korea: IFAC,2008 : 12837-12842. 被引量:1
  • 5郜庆路,罗欣,杨叔子.基于蚂蚁算法的混流车间动态调度研究[J].计算机集成制造系统-CIMS,2003,9(6):456-459. 被引量:52
  • 6Tang L X, Liu W X, Liu J Y. A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment [ J ]. Journal of Intelligent Manufacturing,2005,16 ( 3 ) :361-70. 被引量:1
  • 7安政,苏春.基于规则和仿真的多机并行作业车间生产调度研究[J].工业工程,2010,13(1):64-68. 被引量:4
  • 8Subramaniam V, Raheja A S. mAOR: A heuristic-based reactive repair mechanism for job shop schedules [ J ]. International journal advanced manufacturing technology, 2003, 22 : 669-680. 被引量:1
  • 9Abumaizar R J, Svestka J A. Rescheduling job shops under random disruptions [ J ]. International Journal of Production Research, 1997,35 (7) :2065-2082. 被引量:1
  • 10Liu S Q, Ong H L, Ng K M. Metaheuristies for minimizing the make span of the dynamic shop seheduling problem [ J ]. Advances in Engineering Software, 2005,36 ( 3 ) : 199-205. 被引量:1

二级参考文献44

共引文献90

同被引文献108

引证文献3

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部