摘要
研究电力系统黑启动的过程及恢复中存在的自励磁。过电压、频率和志压稳定、组织措施及女排等问题,并通过华东系统黑启动仿真对上述问题进行分析和解决,证明制定严格的黑启动计划不仅可以迅速恢复系统、降低事故损失。
The paper presents the study on problems of self-excitation. over-voltage, frequency and voltage stability. organizational measures and arrangement in the course of black start and restoration' of the system.Throtlgh simulation ofblack start on East China Poner System, above problems are allalyzed and solved. it shows thill that working out strict blackstart scheme may not only speed up system restoration, reduce outage losses, hilt disc have important significance to emergency release or power system islanding.