京沪高速铁路济南西站装修装饰工程工作分解结构(WBS)应用实践 被引量:5

Application of Work Breakdown Structure in Fitment and Decoration Project of Ji'nan West Railway Station on Beijing-Shanghai High-speed Railway
下载PDF
导出
摘要 进入21世纪,国内外工程项目进入了大型化、复杂化、集群化,铁路工程亦呈现出大标段化,自2008年后铁道部已全面推行标准化管理,以京沪高速铁路济南西站装修装饰工程为样本,探索以工作分解结构(WBS)为基础,以进度计划为主线来组织资源,实施进度、安全、质量、成本全方位的动态控制,全面实现济南西站项目目标,以此来推动国内建筑施工企业项目管理能力的提升。 Eentering into the 21st century,domestic and overseas construction projects become large-scaled,complicated and clustering,and railway engineering presents augmentation of bid sections as well.Ministry of railways has comprehensively pushed forward standardization management since 2008.Based on the project of Ji'nan west railway station on Beijing-Shanghai high-speed railway,this article explores boosting standardization management to integrally promote project management ability based on work breakdown structure.
作者 马宏伟
出处 《铁道标准设计》 北大核心 2011年第12期69-71,81,共4页 Railway Standard Design
关键词 铁路客站 装修装饰工程 工作分解结构 项目管理 Railway-station Decoration works Work breakdown structure Project management
  • 相关文献

参考文献8

二级参考文献4

共引文献13

同被引文献34

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部