胶新铁路路桥过渡段路基沉降规律研究 被引量:5

Analysis on Subgrade Settlement Law in Road-Bridge Transition Section of Jiaozhou-Xinyi Railway
下载PDF
导出
摘要 桥头跳车问题影响着铁路建设和运营,迫切需要解决。结合胶新铁路当地实际情况,开展相关研究,有效减轻差异沉降和桥头跳车的影响,具有重要的现实意义。首先介绍了胶新铁路试验段的基本情况以及试验采用的仪器和测试原理,然后详细分析了不同地段通车前和通车后路桥过渡段的沉降变形特征。 The problem of bumping at bridge head affects railway constriction and operation, which need to be solved urgently. Combined with the local practice of Jiaozhou-Xinyi Railway, related research is conducted to effectively reduce the influence of differential settlement and bumping, which has important practical significance. This paper first introduced the basic situation of Jiaozhou-Xinyi Railway test section and the instrumentation and principle for test; then analyzed the settlement characteristics of road-bridge transition section in different sections before and after opening to traffic.
出处 《路基工程》 2011年第6期45-48,共4页 Subgrade Engineering
关键词 胶新铁路 路桥过渡段 路基沉降 Jiaozhou-Xinyi Railway road-bridge transition section subgrade settlement
  • 相关文献

参考文献12

二级参考文献32

共引文献128

同被引文献11

引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部