期刊文献+

船舶失控应急的港珠澳大桥桥区水域尺度 被引量:6

Range of Bridge Water Area of Hong Kong-Zhuhai-Macao Bridge for Out-of Control Ships in Emergency
下载PDF
导出
摘要 确定桥区水域范围是保证通航船舶和桥梁安全的一个重要因素,但是目前国内外对于如何划分桥区水域的大小并没有明确的标准。以港珠澳大桥为研究对象,从桥梁的有效航宽、拖轮施救时间和船舶失控危险区域三个方面计算了桥区水域尺度。通过对各种工况的计算比较,得出港珠澳段桥区水域尺度为桥梁两侧各2 n mile。 It is an important factor to determine the range of bridge water area to guarantee safety of ship navigation and bridge.However,there is no clarified standard in China or abroad for setting the range of bridge water area at present.Taking Hong kong-Zhuhai-Macao Bridge as an object,the range of the bridge water area is calculated in three aspects: bridge's effective width for navigation,rescuing time for tugboat and dangerous area of out-of-control ships.It is obtained that the bridge water area should cover 2 n miles on each side of the bridge.
出处 《中国航海》 CSCD 北大核心 2011年第4期76-80,共5页 Navigation of China
关键词 水路运输 桥区水域 有效航宽 拖轮施救时间 船舶失控危险区域 waterway transportation bridge water area bridge's effective width rescuing time with tugboat dangerous area of out-of-control ships
  • 相关文献

参考文献9

二级参考文献24

共引文献112

同被引文献49

  • 1孙嫒.船间水动力干扰模型的对比与优化研究.[D].武汉:武汉理工大学,2012. 被引量:1
  • 2VARYANI K S, SOURCE V M. New generic equa- tion for interaction effects on a moored containership due to a passing tanker [J]. Journal of Ship Re- search,2006,50(3) :278-287. 被引量:1
  • 3Wu B, Wang Y, Zhang J, et al. Effectiveness of maritime safety control in different navigation zones using a spatial sequential DEA model: Yangtze River case[J]. Accident Analysis & Prevention, 2015,81:232-242. 被引量:1
  • 4Zhang D, Yan X P, Yang Z L, et al. Incorporation of formal safety assessment and Bayesian network in navigational risk estimation of the Yangtze River[J]. Reliability Engineering & System Safety, 2013, 118: 93- 105. 被引量:1
  • 5Lois P, Wang J, Wall A, et al. Formal safety assessment of cruise ships[J]. Tourism Management, 2004, 25(1): 93-109. 被引量:1
  • 6Zhang J, Yan X, Zhang D, et al. Safety management performance assessment for Maritime Safety Administration (MSA) by using generalized belief rule base methodology[J]. Safety Science, 2014, 63: 157-167. 被引量:1
  • 7Xu Z. Multiple-attribute group decision making with different formats of preference information on attributes[J]. IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics, 2007, 37(6): 1500- 1511. 被引量:1
  • 8Xu Z S, Chen J. MAGDM linear-programming models with distinct uncertain preference structures[J]. IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics, 2008, 38(5): 1356-1370. 被引量:1
  • 9ULUSCU 0 S, OZBAS B, ALTIOK T, et al. Risk analysis of the vessel traffic in the strait of Istanbul[ J]. Risk analy- sis, 2009, 29(10): 1454-1472. 被引量:1
  • 10ZHANG D, YAN X P, YANG Z L, et al. Incorporation of formal safety assessment and Bayesian network in naviga- tional risk estimation of the Yangtze River [ J ]. Reliability engineering & system safety, 2013, 118: 93-105. 被引量:1

引证文献6

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部