快速测量变压器绕组直流电阻实例探讨 被引量:1

Discussing Quick Measuring of Direct Current Resistance of Transformer's Windings
下载PDF
导出
摘要 大型变压器绕组具有很大电感和很小电阻特点,尤其当变压器容量越大时,时间常数往往越大,现场大型变压器绕组直流电阻测量时,常常因为暂态过程持续时间过长,而导致充电电流不能稳定,测量设备所反应的电阻值不真实,严重干扰试验人员分析判断,影响工作进程。为了实现快速测量直流电阻,现场试验可以利用变压器高低压绕组进行串联,采用高压绕组助磁法,以改善上述现象,促进试验工作的进展。 Large-scale transformer winding is characterized by large inductance and small resistance.The larger the transformer's volume,the larger the time-constant is.Because transient process stays long in measuring direct current resistance of transformers' winding on the spot,charging current is not stabilized and values of resistance measured by equipment is not accurate,which severely disturbs operator's judgment and influences the process of project.In order to quick measurement of direct current resistance,concatenation of transformer's high and low voltage and high-voltage saturable magnetic circuit method are employed on field test so as to improve measurement and promote process of project.
作者 李珂
出处 《水电与新能源》 2011年第6期1-3,共3页 Hydropower and New Energy
关键词 变压器 直流电阻 暂态过程 助磁 transformer direct current transient process saturable magnetic circuit method
  • 相关文献

参考文献2

  • 1贺以燕,杨治业主编..变压器试验技术大全[M].沈阳:辽宁科学技术出版社,2006:513.
  • 2DL/T596-1996.电力设备预防性试验规程[S].[S].,.. 被引量:303

共引文献302

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部