期刊文献+

天生桥水电站厂房边坡滑移监测 被引量:1

MONITORING THE SLIP ON PLANT SLOPE OF TIANSHENGQIAO HYDROPOWER STATION
下载PDF
导出
摘要 天生桥二级水电站为一大型引水式水电工程,随着厂房基坑开挖的进展,厂房后边坡岩(土)体发生明显滑移,为掌握其滑移动态,在边坡上埋设了两个测斜孔,应用CX-01型测斜仪对厂房后边坡进行了监测.监测结果表明,滑坡体上部由于削坡减载而趋于稳定;下部仍在滑移,最大滑移速度为0.5mm/d.文中还叙述了该水电站厂房边坡的地质条件、监测仪器及其布置埋设,可供借鉴. The Tianshengqiao No.2 hydroelectric power project is a large hydroelectric engineering. During the period of excavation, the slip of slope was happened clearly. In order to know the sliping, the CX-01 inclinometer was used to monitor the slope. In this paper, provided the results of monitoring. The geological conditions in the slope of power house, monitoring instruments and its management were also introduced.
出处 《中国地质灾害与防治学报》 CSCD 1990年第3期85-91,共7页 The Chinese Journal of Geological Hazard and Control
关键词 滑移动态 泥化夹层 测斜管 位移增量 减载削坡 滑坡体 滑移界面 sliding dynamics, muddy intercalations, inclinometer tube, dis- placement increment, unloading and flatting the slope, landslide body, sliding bound- ary.
  • 相关文献

同被引文献13

  • 1吴铭江 袁培进.CX—01型测斜仪及其在天生桥水电站厂房边坡监测中的应用.大坝观测与土工测试,1988,(6). 被引量:2
  • 2吴铭江.SDJ两用四点钻孔伸长计在八一林隧洞变形观测中的应用.水利水电技术,1985,(5). 被引量:2
  • 3[1]水利水电科学研究院.混凝土坝的内部观测[M].北京:水利电力出版社,1960. 被引量:1
  • 4[8]中国水利水电科学研究院,等.长江三峡水利枢纽永久船闸二期二标段安全监测工程竣工验收报告[R].北京:中国水利水电科学研究院,2003. 被引量:1
  • 5[12]曹健人,祁福环.水管式沉降仪研制报告[R].北京:水利水电科学研究院,1985. 被引量:1
  • 6[13]曹健人,祁福环.水管式渗压计研制报告[R].北京:水利水电科学研究院,1985. 被引量:1
  • 7[14]吴铭江,陶纪昆.钻孔三向变位计测量装置研究报告[R].北京:水利水电科学研究院,1990. 被引量:1
  • 8[15]房纯刚,等.YSC(Ⅰ、Ⅱ)型原位监测多点数据采集和处理系统研制报告[R].北京:水利水电科学研究院,1989. 被引量:1
  • 9[18]黄仁福,吴铭江.地下洞室原位监测[M].北京:水利电力出版社,1990年. 被引量:1
  • 10袁培进,吴铭江.关于混凝土面板法向变形观测方法的探讨[J].大坝观测与土工测试,1997,21(2):25-27. 被引量:5