工程施工网络计划的时差分析与利用 被引量:1

Float Analysis and Utilization of Network Plan for Engineering Construction
下载PDF
导出
摘要 工程施工网络计划中的工序时差是工序可利用的机动时间,总时差与自由时差以及独立时差之间存在着内在的联系,研究它们之间的关系有助于我们进行计划的编制。调整以及在施工中对工程进度的控制,从而获得更大的社会效益与经济效益。 The activity float of network plan in a engineering cons-truction is the time kept in reverse for uti~lization of activity.There are some relations among the total float,the free float and the independentfloat.Studing their relations could help us in making and adjusting the plan and in controling theplanned engineering speed,and we can thus get much more in social and economical benefit.
作者 魏道
出处 《重庆交通大学学报(自然科学版)》 CAS 1994年第S1期113-117,共5页 Journal of Chongqing Jiaotong University(Natural Science)
关键词 网络计划 时差 时差利用 network plan,float,utilization of float
  • 相关文献

参考文献1

  • 1黎谷,郎荣汍编著..建筑施工组织与管理[M].北京:中国人民大学出版社,1987:270.

同被引文献24

  • 1刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. 被引量:70
  • 2徐小琴,韩文民.关键链汇入缓冲区的设置方法[J].工业工程与管理,2007,12(5):51-55. 被引量:21
  • 3W Herroelen, R Leus. Identification and illumination of popu- lar misconception about project scheduling and time buffering in a resource-constrained environment [ J ]. Journal of the Op- erational Research Society ,2005,56( 1 ) : 102-109. 被引量:1
  • 4EliyahuGoldratt.Criticalchain:突破项目管理的瓶颈[M].北京:电子工业出版社,2006. 被引量:1
  • 5Tyson R, Browning, Ali A, Yassine. Resource-constrained uhi-project scheduling: Priority rule performance revisited [J]. International Journal of Production Economics, 2010, 126(2) :212-228. 被引量:1
  • 6Kuo Tsai-chi, Chang Sheng-Hung, Huang Shang-nan. Due- :late performance improvement using TOC' s aggregated time 3uffer method at a wafer fabrication factory [ J ]. Expert Sys- eros with Application,2009,36(2) :1783-1792. 被引量:1
  • 7John E Hebert, Richard F Deckrp. Combining contemporary md traditional project management tools to resolve a project cheduling problem [ J]. Computers & Operations Research, 5011,38(1) :21-32. 被引量:1
  • 8Willy Herroelen, Roel Leus. On the merits and pitfalls of crit- cal chain scheduling [ J ]. Journal of Operations Manage- nent,2001,19 (5) : 559-577. 被引量:1
  • 9Willy Herroelen, Roel Leus, Erik Demeulemeester. Critical hain project scheduling: do not oversimplify [ J ]. Project VIanagement Journal, 2002,33 (4) :48-60. 被引量:1
  • 10Tzvi Raz, Robert Barnes, Dov Dvir. A critical look at critical chain project management [ J ]. Project Management Journal, 2003,34(4) :24-32. 被引量:1

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部