摘要
以河南武陟沁河新左堤砼截渗墙加固工程为例 ,对砼截渗墙干法施工的关键技术问题进行了分析论证 ,详细阐述了其施工工艺 。
The impervious wall project in the new left bank of Wuzhi Qin River is instanced in this paper. The key construction technique problems of impervious concrete wall by dry way are analysed, and the construction technology and some points for attention are explained. As a new way it is worthy of application and dissemination.