摘要
介绍海南某工程大坡度斜井净空断面测量方法。通过数据采集,进行坐标转换,能够方便地计算出测点超欠挖。现场测量表明:该方法经济实用,能达到事半功倍的效果。
This paper introduces the transverse section measuring method of the large slope inclined shaft construction gauge of a project in Hainan province.Through data collection and coordinate transformation,the over-under-excavated values can be obtained easily.And the practical use shows that this method has a good prospect.
出处
《公路交通科技》
CAS
CSCD
北大核心
2005年第S2期158-160,共3页
Journal of Highway and Transportation Research and Development
关键词
数据采集
坐标转换
超欠挖
Data collection
Coordinate transformation
Over-under-excavated values