6A Unit of IZobbins and Myers Inc. R&M Energy Sys-terns:Progressing Cavity(PC) Pump Design Optimiza-tion for Abrasive Applications[R]. SPE37455, l997. 被引量:1
9A Unit of Robbins and Myers Inc. R&M Energy Systems:Progressing Cavity (PC) Pump Design Optimization for Abrasive Applications[R]. SPE87455, 1997. 被引量:1
3Krawiec,M.B.,Finn,C.M.,Cockbill,J.R.,&Fortnum,D.E.(2008,January 1).Dewatering Coalbed Methane Wells Using ESPCPs.Petroleum Society of Canada.doi:10.2118/2008-201-EA. 被引量:1