摘要
天津北疆电厂是国家首批循环经济试点项目,其选址渤海湾西北湾顶,海岸坡缓水浅、含沙量大,不利于电厂取水。通过引潮沟方案和沉淀池方案的比选研究,最终采用两级沉淀调节池高潮进水方案,不仅具有取水保证率高、水质条件好,而且工程投资低、运行灵活、维护方便,是淤泥质浅滩上一种新型的取水方式。该电厂充分利用海水资源,并生产出高品质的淡化海水,标志着该项目的循环经济建设目标已经全部实现。
Tianjin Beijiang Power Plant, on the level pilot project for sustainable economy. The northwest coast of Bohai Bay, is a nationalsite is a shallow muddy coast with mild slope and high sediment concentration, which is not conducive to seawater intake. By means of comparing tidal creek and settling ponds schemes, the two-step settling ponds scheme is finally selected. The constructed intake work with advantages of high guarantee rate of water supply, reliable quality and quantity, low investment, convenience of management, is a new way of seawater intake in muddy coasts. The plant has made full use of seawater and produced highquality desalinated water, which marks that the project objectives have been achieved.
出处
《海洋经济》
2011年第4期29-34,共6页
Marine Economy
关键词
循环经济
海水淡化
取水工程
引潮沟
沉淀池
北疆电厂
sustainable economy
seawater desalination
intake work
tidal creek
settlingponds
Beijiang Power Plant