摘要
On March 27,2011,Jin'anqiao Hydropower Station on Jinsha River with a total installed capacity of 2.4 GW was formally connected to the grid to generate electricity.Jin'anqiao Hydropower Station is
On March 27,2011,Jin'anqiao Hydropower Station on Jinsha River with a total installed capacity of 2.4 GW was formally connected to the grid to generate electricity.