摘要
旧水泥混凝土路面加铺沥青面层与热拌沥青混合料施工工艺基本相同,但也具有一定的特殊性。由于旧水泥混凝土路面成为了新路面的基层,因此施工前对旧路面进行处理是非常重要的。
The construction technology of paving asphalt surface on old cement concrete pavement is almost same with that of hot mixing asphalt mixture,but it also has a certain particularity.Because the old cement concrete pavement has became the base course of new pavement,it is very important to treat old pavement before construction.
出处
《交通标准化》
2011年第19期39-41,共3页
Communications Standardization
关键词
冲击
压实
施工
应用
impact
compaction
construction
application