摘要
本文阐述了某半潜式钻井平台动力系统结构,分析了瘫船后两种不同的起动恢复方案,给出了其备用方案的可行性和各自特点,有助于确保钻井平台的电网在规定的时间内快速恢复并正常运行。
In this paper, the power system structure of drilling platform is proposed, and two different schemes for the starting of "paralyzed ship" of the Brazilian drilling platform are expounded. The feasibility and superiority of the spare scheme are explained, which can ensure the quick recovery of power system and normal operation within the prescribed time and ensure personnel and equipment safety on the drilling platform.
出处
《船电技术》
2011年第10期41-45,共5页
Marine Electric & Electronic Engineering