期刊文献+

浦东大酒店改造工程结构设计

Structural design of reinforcement and reconstruction for Pudong Grand Hotel
原文传递
导出
摘要 在浦东大酒店改造工程设计中应用了体系加固设计思路,采用防屈曲耗能支撑技术,使结构满足现行的抗震设防要求,而且有效减少了结构加固的工作量,缩短了施工工期。介绍了组合加固技术、锚杆静压桩基础加固技术在浦东大酒店改造工程中的应用,以及各种节点构造、大跨钢雨篷结构等内容。 During the structural design of reinforcement and reconstruction for Pudong Grand Hotel,design idea of system strengthening was adopted and buckling-restrained brace(BRB) system was used to make the structure meet the requirements of the current code for seismic design effectively,and to reduce the number of structure members which have to be reinforced,so as to shorten the reconstruction time.Combined strengthening method and static-pressing pile foundation with anchor bolts strengthening method used in Pudong Grand Hotel were introduced.In addition,joint construction and large-span steel canopy were presented.
出处 《建筑结构》 CSCD 北大核心 2011年第10期112-115,26,共5页 Building Structure
关键词 改造加固 防屈曲耗能支撑 节点构造 reinforcement reconstruction buckling-restrained brace joint construction
  • 相关文献

参考文献4

二级参考文献7

  • 1汪家铭,中岛正爱,陆烨.屈曲约束支撑体系的应用与研究进展(Ⅰ)[J].建筑钢结构进展,2005,7(1):1-12. 被引量:189
  • 2GB/T228--2002金属材料室温拉伸试验方法[S].北京:中国标准出版社,2002. 被引量:7
  • 3Recommended Provisions for Buckling-restrained Brace Frames[S]. America Institute of Construction ,2001. 被引量:1
  • 4BLACK C J, MAKRIS N, AIKEN I D. Component testing, seismic evaluation and characterization of buckling-restrained braces [ J ]. Journal of Structural Engineering, ASCE, 2004, 130(6): 880-894. 被引量:1
  • 5SABELLIR. Recommended provisions for buckling-restrained braced frames[J]. Engineering Journal AISC, 2004, 41(4) : 155-175. 被引量:1
  • 6CHEN C C, WANGCH, HWANGTC. Buckling strength of buckling inhibited braces [ C ]//Proceedings, 3rd Japan-Korea-Taiwan Joint Seminar on Earthquake Engineering for Building Structures, Tai-pei Taiwan, 2001 : 265-271. 被引量:1
  • 7钱洪涛 褚洪民 邓雪松.防屈曲支撑的研究与应用进展.防灾减灾工程学报,2007,27(1):225-233. 被引量:5

共引文献952

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部