摘要
滩坑水电站平面控制网建立于施工初期,为电站的施工建设发挥了重要作用。目前电站已经建成发电,为了解各控制网点经过施工期、蓄水期的稳定情况进行了本次监测。文章详细阐述了平面控制网监测的现场实施、成果验算、平差计算和稳定分析。
The plane control network of Tankeng Hydropower Station was set up in the early construction period, and has played an important role for the station construction. At present, the hydropower station has completed and been generating electricity. To acquire the stability of control points through the construction period and the impounding period, this monitoring is carried out. Construction, achievement checking, calculations of adjustment and the stability analysis of the plane control network are introduced in this paper.
出处
《西北水电》
2011年第B09期101-104,共4页
Northwest Hydropower
关键词
滩坑水电站
平面控制网
监测
Tankeng Hydropower Station
plane control network
monitoring