摘要
本文通过老山隧道机电工程养护管理,分析养护模式的选择,预防性养护以及养护过程中重大问题处置,剖析双电源切换装置的设置、绝缘监察装置异常和照明跳闸原因,提出相关解决方案。以对特长公路隧道仍至小隧道群的机电工程建设和养护提供借鉴。
Through Laoshan tunnel mechanical and electrical project maintenance management, this article analyzes choice of maintenance pattern, preventive maintenance as well as handling of major issue in process of maintenance, analyzes the double power switching device settings, abnormalities with insulation monitoring device and the reason of illumination trip, proposes the related solutions, so as to provide reference for mechanical and electrical engineering construction and the maintenance of super-long road tunnel and small tunnel group.
出处
《价值工程》
2011年第27期30-31,共2页
Value Engineering
关键词
隧道
机电工程
养护
管理
tunnel
mechanical and electrical
project
maintenance
management