湿陷性黄土地区变电工程地基处理投资分析 被引量:1

Investment Analysis of Foundation Treatment for Substation Engineering in Collapsible Loess Area
下载PDF
导出
摘要 介绍了湿陷性黄土地区变电工程常用的地基处理方法,分析不同地质条件对地基处理投资的影响。通过对典型案例的投资进行分析,得出影响地基处理投资的主要因素,提出各种地基处理方案的应用条件和地基处理造价控制措施。为合理确定工程造价,有效控制建设成本提供依据。 The paper introduces the common ground treatment methods for the loess region substation engineering, and analyzes the effects of different geological conditions on the ground treatment investment. Through the investment analysis of the typical cases, the main factors of affecting the foundation treatment investment are obtained, and the application condition for the various ground treatment plans is proposed as well as suggesting the control measures of the ground treatment cost.
出处 《陕西电力》 2011年第8期58-61,65,共5页 Shanxi Electric Power
关键词 湿陷性黄土 地基处理 投资分析 collapsible loess foundation treatment investment analysis
  • 相关文献

参考文献3

  • 1GB50025-2004湿陷性黄土地区建筑规范[S].北京:中国建筑工业出版社,2004. 被引量:46
  • 2陕西省电力公司.湿陷性黄土、沙漠等特殊地质条件输变电.工程建设投资分析专题报告[R].西安:陕西省电力公司.2011. 被引量:1
  • 3陕西省电力设计院.池阳330kV变电站变电工程投资概算[R].西安:陕西省电力设计院,2005-2011. 被引量:1