期刊文献+

基于深部位移监测的渐进推移式滑坡变形传递过程研究 被引量:2

Deformation Process of Thrust Load-Caused Landslide on the Basis of Deep Displacement Monitoring
下载PDF
导出
摘要 根据巴东县张家屋滑坡的地表位移变化,分析三峡库区高水位运行下,降雨为该滑坡变形的主要影响因素,进一步根据深部(滑带)位移与降雨量的相关性,得出滑带土变形较降雨有一定的滞后性,且滞后时间由后至前逐渐增大,表现出滑带变形由后缘向前缘传递的特征,揭示了渐进推移式滑坡的变形特点,并利用FLAC数值软件模拟了该滑坡在滑体重度逐渐饱和下位移的变化过程,结果与实际变形传递特征一致。 According to the surface displacement of the Zhang Jiawu landslide in Badong County,this paper revealed that the main factor affecting landslide deformation is rainfall,and sliding soil deformation is later than the rainfall,and the lag time is progressively larger from the trailing edge to the leading edge of sliding soil.Meanwhile,by the FLAC,the paper simulated the deformation process of the Zhang Jiawu landslide in gradually saturated weight of sliding,and obtained the same results as those encountered in the actual situation.
出处 《地球与环境》 CAS CSCD 北大核心 2011年第3期338-342,共5页 Earth and Environment
基金 国家重点基础研究发展规划(973)项目(2011CB710605) 三峡库区三期地质灾害防治监测预警工程资助项目(SXJC-3ZH1D1_合[2009]003)
关键词 渐进推移式滑坡 深部位移监测 变形传递 FLAC模拟 thrust load-caused landslide deep displacement monitoring deformation transfer FLAC simulation
  • 相关文献

参考文献8

二级参考文献18

共引文献77

同被引文献35

引证文献2

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部