高地应力中厚煤层工作面超前支护距离的研究

Study on Pre-support Distance among Working Faces in High Geostress Medium Thick Seams
下载PDF
导出
摘要 通过对某矿2号煤首采工作面顶底板岩石力学性质的测试,采用工程类比法确定工作面顺槽围岩稳定性属Ⅲ类中等稳定类型,并确定了工作面顺槽的基本支护方式。采用数值模拟方法,系统的分析了高地应力条件下回采工作面前方顺槽的顶底板、两帮移近量;顺槽锚杆、锚索和锚固范围内的岩层离层情况以及工作面前方顺槽围岩的屈服破坏情况。 Through mechanical properties test on roof and floor rocks in the No.2 first mining face of some mine, engineering analogism was used to determine the stability of surrounding rock of working face crossheading to be medium, type 3 and to specify the basic supporting methods. By numerical simulation, systematic analysis was carried on the roof-floor and two-side displacement of front crossheading of caving face under the condition of high geostress, rock separation within the limits of its bolt, cable and anchorage, and yield damage among its surrounding rocks.
作者 王伟
出处 《山西煤炭》 2011年第8期50-51,79,共3页 Shanxi Coal
关键词 工程类比 顺槽 支护方式 数值模拟 超前支护 engineering analogism crossheading supporting numerical simulation pre-support
  • 相关文献

参考文献5

二级参考文献13

共引文献83

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部