多项目进度瓶颈——关键链束 被引量:5

The Bottle Neck of Multiple Projects——Critical Chain Bundle
下载PDF
导出
摘要 针对多项目进度管理特点,考虑各个子项目工期对企业整体利益的影响,提出用关键链束表征多项目瓶颈的观点。借鉴单项目关键链管理方法,将约束理论与多项目管理实际相结合,对关键链束的识别及缓冲区的设置作了相应探讨,并应用实例进行演示。 A viewpoint is bring forward that should denote the taking into account the characteristic of multi-project and bundle multi-project " bottle neck" with critical chain the influence the sub-projects have on thetotal objective of the corporation. Then, the theory of constraints with multiple projects is combined, studied the identifying of the critical chain bundle and the setting of the buffers, adopting and ameliorating the traditional method of critical chain management. At last, there is a simple example to demonstrate the process.
作者 钟稳 廖良才
出处 《科学技术与工程》 2011年第25期6245-6248,共4页 Science Technology and Engineering
关键词 多项目管理 瓶颈 关键链技术 关键链束 multi-project management bottle neck critical chain method critical chain bundle
  • 相关文献

参考文献7

二级参考文献35

共引文献90

同被引文献23

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部