摘要
工程质量是工程项目的建设核心,是决定工程建设成败的关键;工程质量不仅关系到人们的生命和财产安全,而且关系到社会信誉和社会效益。因此,做为工程建设者必须具备崇高的事业心和强烈的责任感,用我们的双手为子孙后代造福。本文以机械加速澄清池施工质量控制过程为研究对象,着重阐明建设过程中三个阶段准备阶段、施工阶段、竣工阶段的质量控制。
Engineering quality is the core part of a construction project.It is the key to the success of engineering construction.Engineering quality is not only a matter of safety to life and property,but also related to the reputation of a society and the profits of an enterprise.So engineering constructors must possess high moral standard of professional devotion and strong responsibility to ensure that the construction projects are reliable to be in high quality.In this article,quality control proceedings of mechanical accelerating defecation pond construction were studied,especially on the quality control of three stages of construction,that is preparation,under construction and finishing.
出处
《安徽冶金科技职业学院学报》
2011年第3期41-43,共3页
Journal of Anhui Vocational College of Metallurgy and Technology
关键词
结构特殊
工艺复杂
质量控制
special structure
complicated processing
quality control