通过对现浇连续箱梁的施工过程的详细分析,总结并提出现浇连续箱梁施工控制的方法和措施,可供同行参考。
Through detailed analysis on construction process of cast-in-place continuous box girder,the construction control methods and measures are put forward,which can be consulted by peers.
出处
《交通标准化》
2011年第12期37-39,共3页
Communications Standardization
关键词
现浇连续箱梁
支架搭设
模板制做与安装
预应力
cast-in-place continuous box girder
support setting
fabrication and installation of moulding board
prestress