摘要
通过工程实例,介绍了当采用挂篮法分段悬臂浇筑连续梁边跨的两个不对称梁段时,针对如何有效地控制结构在施工过程中出现动态不平衡弯矩的问题,总结了一种切实可行的解决方法,并对其理论依据进行了简要分析。
This paper introduced a practical solution to the problem of dynamical imbalance bending during the casting of the two side span asymmetric beam of continuous beam with suspended basket cantilever and the theoretical basis is briefly analyzed.